EU PUE Rule: Mandatory Measurement in Data Centres

Energy efficiency in European data centres is entering a new era. From 2025, stricter regulations will require comprehensive monitoring and reporting of energy usage, pushing facilities to operate smarter and greener.

Since 1 January 2025, data centres across Europe are required to measure and report their Power Usage Effectiveness (PUE), according to the updated Energy Efficiency Directive (EED) of the European Union. This regulation is part of the broader “Fit for 55” plan, aiming to reduce greenhouse gas emissions by 55% by 2030. The new directive imposes stricter requirements for monitoring energy consumption in data centres, particularly those with high energy usage. The data must be submitted to a European database that is publicly accessible for regulators.

For data centres, this means that accurate monitoring of energy usage and reporting of PUE data will be crucial. It will play a key role in improving energy efficiency and reducing the environmental impact of data centres. But how can your facility meet these new requirements?

The EU provides specific guidelines for measuring PUE, and Schleifenbauer offers a simple, cost-effective solution to help you comply without replacing your entire infrastructure.

Stricter Energy Saving Goals and Central Database

With the stricter energy-saving goals that apply from 2025, greater emphasis will be placed on higher efficiency. The central database will enforce compliance and monitor data centre performance. For more information on the EED and new guidelines, visit the official EU websites:

Schleifenbauer: Your Partner for Sustainable Energy Management
Schleifenbauer is ready to support you in implementing sustainable solutions that meet the new EU requirements.

Inline Energy Meter upgrade basic PDU to measurement
Inline Energy Meter upgrade basic PDU to measurement

Upgrade Your Non-Smart PDUs with the Schleifenbauer Inline Meter

Our innovative Inline Meter can turn any standard PDU into a smart, measurable unit. By placing the Inline Meter between your power source and existing PDU, you not only meet the legal requirements but also gain detailed insights into your energy usage, helping optimise your energy management.

Key Benefits:

  • Comprehensive Energy Measurement: Our advanced firmware provides detailed energy data and seamless integration with your existing DCIM software, supported by multiple protocols including embedded SSL Security (HTTPS), HTML, IPAPI, WEBAPI, MODBUS/TCP, and SNMP (v1, v2c, and v3).
  • User-Friendly Interface: Manage your energy consumption through our intuitive web interface, which offers clear reports and real-time insights.
  • Scalable Solution: Daisy-chain over 50 Inline Meters, all manageable via a single IP address for streamlined monitoring.
  • Custom Solutions: We provide custom Inline Meters tailored to your needs, with no extra costs, quick delivery, and manufactured in the Netherlands.
  • Easy Installation: Suitable for both vertical and horizontal mounting in a 19-inch server rack.
  • Cost Savings: Upgrade your existing PDUs without the expense of full replacement.

Full Upgrade to Intelligent Schleifenbauer PDUs

It is also possible to replace your entire installed PDU base with intelligent PDUs from Schleifenbauer. You won’t need to search for a suitable PDU from standard product portfolios of other suppliers. Schleifenbauer creates a custom-made PDU tailored precisely to your existing infrastructure, without extra costs. Everything is manufactured in the Netherlands and delivered with exceptional speed.

Prepare Your Data Centre for New EU Regulations
Ensure your data centre complies with the PUE reporting requirement and optimise your energy management with Schleifenbauer’s reliable solutions. Contact us today for advice on the best solution for your data centre.

Schleifenbauer Products BV
‘s-Hertogenbosch, The Netherlands
Email: info@schleifenbauer.eu
Phone: +31 73 523 0256

Click here for example Inline Energy Meters

Smarter energy monitoring without replacing your PDUs? Yes, it’s possible.

With rising demands for energy transparency and legislation like the EED, data centres must monitor and report energy use — even when working with basic PDUs.

The Schleifenbauer Inline Meter offers a cost-effective upgrade: it turns your existing PDUs into measurable systems without full replacement.

Available as:
– G3 with integrated display and controller
– 5.0 with NFC and mobile app

The Inline Meter supports SNMP, Modbus/TCP, REST API, HTTP/HTTPS, and integrates with most DCIM platforms. Alternatively, use EnerTree, Schleifenbauer’s free DCEM software.

Tell us your PDU preferences and get your personalized quote within one day, completely obligation-free.

Request a Quote